Mazowsze dla klimatu i Mazowsze dla melioracji – przewodnik po dwóch programach wsparcia dla gmin i spółek wodnych

As of July 28, 2026. Both programs run in cycles, but the next edition – referred to below for convenience as the 2027 edition – has not yet been announced. We are a pump manufacturer and distributor, not a grant consultant – this text is for informational purposes only, and only documents published by the Marshal's Office of the Mazovian Voivodeship are binding.

Who this guide is for

This text is intended for municipalities, counties and water companies preparing an application for the next application round. We have compiled in one place the rules set out in resolutions of the Mazovian Voivodeship Regional Assembly, the regulations for the climate program, and the application and agreement templates, and then compared them with the application rounds held between 2022 and 2026. Here you will find deadlines, funding limits, lists of eligible and ineligible costs, required attachments, and the most common reasons for rejecting applications – along with an indication of which document establishes each requirement.

We devote a separate section to water management in eligible projects: draining a section of ditch before desilting it, and rainwater retention systems in blue-green infrastructure. This is the only section in which we speak from the perspective of a manufacturer – the remaining sections summarize official provisions.

Two programs, two separate procedures – a comparison

A common misconception is to treat the two programs as two versions of the same instrument. W reality, they are run by separate departments of the office, and the programs differ in their legal basis, eligible beneficiaries, application deadlines, and rules for paying out funds.

  Mazowsze for Drainage Mazowsze for Climate
Who can apply Water companies operating in the Mazovian Voivodeship Municipalities and counties in the Mazovian Voivodeship
What for Routine maintenance of watercourses and water infrastructure (7 types of work on ditches and drainage systems) Blue-green infrastructure, plantings and green spaces (including salt graduation towers), outdoor lighting
Amount of support 80% of the project value, no more than PLN 100,000 Up to 50% of eligible costs (2026 edition), no more than PLN 200,000
When the last application round was open January 2–31, 2026 March 2-16, 2026
When the announcement was published December 12, 2025 (BIP) February 26, 2026 (BIP)
How the funds are paid Transfer within 30 days of signing the agreement – before the work is carried out Reimbursement – after the project has been completed and settled
Basis Regional Assembly Resolutions No. 34/22, 175/22 and 124/24 (a local law, in force indefinitely) Regulations adopted each year in a separate resolution of the Voivodeship Executive Board
What determines the award Order of applications Merit-based scoring; in the event of a tie – order of applications (date and time)

Mazowsze for drainage – grants for water companies

Legal basis – three resolutions that should be read together

The program is based on Article 443(2) and (4) of the Act of July 20, 2017 – Water Law, which allows local government units to provide grants to water companies. The rules in Mazovia are set out in Resolution No. 34/22 of the Mazovian Voivodeship Assembly of March 22, 2022, amended twice:

  • Resolution No. 175/22 of November 22, 2022 – added a list of costs excluded from the grant, clarified the list of attachments and how maps should be labeled;
  • Resolution No. 124/24 of November 19, 2024 – expanded the scope of work to include drainage inspection chambers and outlets, adapted the de minimis aid provisions to European Commission Regulation (EU) 2023/2831, and changed the application period to January 2–31 of the budget year.

The documentation should therefore be reviewed by considering all three resolutions together: Resolution No. 34/22 is the base text, and the two subsequent resolutions amend it. An amending resolution is not a standalone, complete set of rules – it contains only a list of the amendments being introduced.

What work can be funded

The grant covers the ongoing maintenance of waters and water facilities, understood as the operation, maintenance and repair of facilities to preserve the functions of water management infrastructure. Following the 2024 amendment, eligible work includes:

  1. mechanical and manual desilting of ditches,
  2. mechanical and manual mowing of ditch beds and banks,
  3. raking vegetation from ditch banks and beds,
  4. grubbing and cutting down trees and shrubs on ditch banks and beds,
  5. cleaning and repairing structures on ditches,
  6. repairing ditch banks,
  7. cleaning, repairing or replacing drainage outlets and inspection chambers.

Grant amounts and the order in which funds are awarded

The grant covers 80% of the value of the requested project, up to a maximum of PLN 100,000. The water company covers the remaining 20% itself. If the total amount requested exceeds the funds set aside in the voivodeship budget, the order in which applications are submitted determines who receives a grant – not the score, the condition of the ditch, or the size of the company. This is the most important practical point in the entire program: a complete application submitted on January 2 has a different standing from an identical application submitted on January 30. A water company may submit only one application per budget year.

Application deadlines and submission methods

  • Application period: January 2–31 of the budget year. The exception was 2025, when applications were accepted from February 3 to 28. W 2026, the standard January deadline was already in effect.
  • Applications submitted after the deadline will not be considered. For applications sent by mail, the postmark date or date of posting counts.
  • How to submit: in person at the Mazovian Voivodeship Office’s filing offices, by mail to ul. Jagiellońska 26, 03-719 Warsaw, or electronically via ePUAP or e-Delivery.
  • Work may begin no earlier than the date the agreement is signed. Expenses incurred earlier will not be settled.
  • Settlement: The report on the use of the grant must be submitted no later than November 30 of the budget year.

WIn the 2026 announcement, the authority added a procedural warning: when submitting a letter via ePUAP, it is recommended to confirm its receipt by phone, and replies are sent by regular mail.

Costs covered by the grant

This section of the documents is sometimes reviewed superficially, even though it contains provisions that most often determine whether the grant is properly accounted for.

Basic rule: the grant covers the costs of carrying out the work (labor costs) and the fuel used to perform the work specified in the agreement.

Excluded costs (added by Resolution 175/22): bonuses, profits, awards, employee travel, delivery and security of equipment, employee training, preparation of design and cost estimate documentation, formal and legal approvals, tender proceedings, surveying services, and the purchase of maps.

An exception for equipment deserves special attention. Both the 2026 call for applications and the model agreement allow grant funds to cover the purchase of equipment necessary to carry out the task, subject to two conditions being met jointly:

  • the purchase price of any single piece of equipment may not exceed PLN 2,000,
  • the total amount spent on purchasing such equipment may not exceed 30% of the grant.

In addition, the grant may cover equipment repair costs, but only if the breakdown occurred during and in connection with the work covered by the agreement, the repairs were carried out by an appropriate service provider, and the company submits a statement confirming the breakdown and an invoice for the service.

A decisive reservation applies: the grant may not be used to cover costs not listed in the investment cost estimate or works not specified in the list of works included in the application. An item not included in the cost estimate submitted in January cannot be accounted for in November.

Application attachments – checklist

According to the application form applicable in 2026 (appendix to Resolution 124/24), the application must include originals or copies certified as true to the original by a person authorized to represent the company:

  1. the current articles of association of the water company or a certificate from the Polish Waters National Water Management Authority issued from its water management information system;
  2. a document confirming the constitution of the company’s management board;
  3. a document (authorization) confirming the authority to represent the company and sign the agreement;
  4. a map clearly marking each ditch section, with its name, length, and the numbers of the starting and ending plots;
  5. investment cost estimate (gross);
  6. notifications, permits, approvals and administrative decisions, if required by separate regulations;
  7. certificates of de minimis aid (and de minimis aid in agriculture or fisheries) received over the past 3 years, or a statement of its amount, or a statement that no such aid was received;
  8. information specified in the Council of Ministers Regulation of March 29, 2010, concerning the scope of information to be provided by an entity applying for de minimis aid.

The call for applications emphasizes that every page of the submitted documents must be signed or certified by persons authorized to represent the company, and those persons must submit documents confirming their authority.

De minimis aid – who it applies to

If a water company carries out business activity within the meaning of EU competition law, the grant portion relating to that activity (if it can be separated from non-business activity) constitutes de minimis aid. Since the 2024 amendment, Commission Regulation (EU) 2023/2831 applies, and grants under this scheme may be awarded on the basis of the resolution until December 31, 2030. The application contains a separate field indicating whether the company carries out business activity.

Most common errors – according to the authority’s own justification

The justification for Resolution 175/22 describes the results of the 2022 pilot application round, which received 166 applications, most of which were found to have formal deficiencies. The list of issues identified at the time serves as a practical checklist:

  • failure to document the right to make declarations of intent on behalf of the company,
  • inconsistencies in the lengths of drainage ditches shown on maps, in applications and in cost estimates,
  • not showing the locations of infrastructure or arbitrarily drawing drainage ditches on maps,
  • listing nonexistent property numbers,
  • incorrect identification of cadastral districts and incomplete locations of drainage ditches,
  • submitting photocopies that have not been certified as true copies of the originals.

A request to remedy deficiencies is sent only once, with a 7-day deadline calculated from the day following delivery. If the deadline passes without action, the application will not be considered.

Implementation and settlement

According to the 2026 agreement template:

  • the grant amount is transferred to the company’s account within 30 days of signing the agreement;
  • the project is carried out from the date the agreement is signed until November 30 of the relevant year;
  • any change to the scope of work requires an annex, and a proposed change must be submitted no later than 21 days before the end of the implementation period;
  • if the scope of work or the cost of the project is reduced, the grant is reduced proportionally; if the project’s value increases, the grant does not increase;
  • the report must include, among other things, contracts with contractors, acceptance reports, invoices with proof of payment and an as-built cost estimate; if there are multiple cost estimates or invoices, an as-built cost statement must also be provided;
  • Photographic documentation of each section, taken from the same location before work begins and after it is completed, is required;
  • a grant used for an unintended purpose, unduly awarded or excessive must be repaid with interest at the rate applicable to tax arrears;
  • The company displays the Mazowsze Brand logo and the support program logo, along with a co-funding statement; graphic designs are approved by email at siw@mazovia.pl.

W For the 2026 application period, the office also announced that, during the verification stage, it would additionally check whether sections of ditches pass through farmed wetlands and peatlands covered by GAEC 2, and whether dredging, cleaning drainage outlets, clearing bushes and unblocking pipelines on those sections had been carried out more than once every three years. It is worth checking this before describing the scope of work.

Mazowsze for Climate - grants for municipalities and counties

How the program is structured

The full name is Mazovian Climate Change Adaptation Support Instrument - Mazowsze for Climate. Unlike drainage projects, there is no single permanent resolution: each edition is launched under new Rules adopted by a resolution of the Regional Board. The 2026 edition was launched by Resolution No. 321/157/26 of February 23, 2026, and the 2025 edition by Resolution No. 377/61/25 of February 24, 2025. This means that the scope and funding level may change from year to year, and the rules from a previous edition should not be applied to a new one.

The program aims to improve protection against the effects of climate change and natural hazards, with particular emphasis on blue-green infrastructure, planting greenery and energy efficiency.

What changed between the 2025 and 2026 editions

  2025 edition 2026 edition
Areas 1) blue-green infrastructure, 2) planting greenery and green areas, 3) outdoor lighting, 4) SECAP plan Blue-green infrastructure, planting greenery and developing green areas (including salt graduation towers), outdoor lighting
Funding rate Up to 70% for blue-green infrastructure, up to 50% for other areas Up to 50% of eligible costs
Funding cap PLN 200,000 PLN 200,000
Application period March 3-21, 2025 March 2-16, 2026

For comparison: in the first edition in 2022, the maximum grant was PLN 100,000, covering 50% of eligible costs. The program is growing, but its thematic scope is sometimes narrowed - in 2026, funding for SECAP plans and the preferential 70% rate for blue-green infrastructure were discontinued.

Application rules

  • The applicant may submit one application for funding of up to PLN 200,000 or two applications for different projects, provided that the total funding does not exceed PLN 200,000. W In the case of the City of Warsaw, a maximum of two applications may be submitted for each district, subject to the same total limit.
  • Each application must be submitted separately via ePUAP or e-Delivery (in 2025, via a trusted profile on ePUAP). W If the system is unavailable, applications may be sent to polityka.ekologiczna@mazovia.pl.
  • The application must be signed with a certified digital signature by a person authorized to make declarations of intent on behalf of the municipality or county, with the treasurer’s countersignature.
  • Documents confirming the estimated total project costs must be attached to the application. A visualization, design, or other form of illustration is optional.

Payment after project completion – implications for budget planning

Financial assistance is awarded as a grant paid after the project has been completed and accounted for. Under the 2025 edition rules, beneficiaries must use their own contribution to cover 100% of the project costs – both eligible and ineligible costs – and only then receive reimbursement for some of the eligible costs. Funding for the beneficiary’s contribution cannot come from other regional budget funds. Payment is made within 21 days of approval of the final report.

How applications are evaluated and what the competition is really like

Applications undergo formal and substantive evaluation. The substantive evaluation considers the G/P ratio (the municipality or county’s own-source revenue per resident compared with the Mazovia average), the type of project, and grants previously received under the program. If scores are tied, the applicant’s place on the Beneficiary List is determined by the order of submission – the date and time the application was submitted.

Figures from the 2026 edition, as stated in the justification for Mazovia Regional Assembly Resolution No. 70/26 of May 19, 2026:

  • 303 applications were submitted; one applicant withdrew their application,
  • 302 applications totaling over PLN 33.3 million (PLN 33,374,625) passed the formal review,
  • PLN 15,000,000 was allocated in the regional budget,
  • 137 projects received funding, totaling PLN 14,930,138.

This means the total amount requested exceeded the available funding by more than two times, and approximately 45% of applications received funding. Beneficiaries on the list scored between 54 and 60 points, and street lighting – solar, hybrid, and the replacement of fixtures with LED lights – accounted for the vast majority of projects. Brine graduation towers featured in a dozen or so municipalities. Grant amounts ranged from tens of thousands of złoty up to the full limit of PLN 200,000.

Obligations overlooked when planning costs

  • The beneficiary must display the Mazowsze Brand logo and the support program logo, along with a co-funding statement, on informational and promotional materials, the website, and social media. Social media posts must use the hashtags #Mazowszepomaga, #programywsparcia, and #solidarnośćmazowiecka.
  • After the project is completed, an information board measuring 90 × 70 cm must be displayed for at least 5 years – the beneficiary bears the cost, which cannot be charged to the grant.
  • The project may be inspected by the regional authorities for 5 years after completion.

Using pumping equipment for tasks covered by the programs

Below, we identify only those elements of the work scope where using pumping equipment is technically justified, together with the formal requirements that must be taken into account when preparing the application.

Ditch desilting – draining the work area

A ditch is desilted in its channel, where water usually stands. In practice, the work follows much the same sequence: lower the water level in the work area, then remove the silt and repair the banks. A clean-water pump is not suitable for pumping water containing suspended matter, sand, and solids; a pump designed for contaminated water or sludge is needed, with adequate free passage and a durable hydraulic section.

W Depending on the level of contamination in the medium and access to a power supply, three groups of equipment are used:

Formal requirements that must not be overlooked. The grant primarily covers labor and fuel. Equipment purchases are allowed, but only up to PLN 2,000 per item and a maximum of 30% of the grant amount, and the expense must be included in the investment cost estimate and the list of work in the application. Equipment purchased before signing the agreement will not be reimbursed. The authorities decide whether a specific expense is eligible, so it is always worth asking the Department of Rural Areas Modernization and Water Management before submitting the application, not after making the purchase.

For blue-green infrastructure: pumps as part of the system

W In the 2025 edition regulations—the most detailed publicly available document for this program in a citable format—rainwater retention from the roofs of public buildings is listed among the measures covered by blue-green infrastructure, including, specifically: rainwater tanks connected to downspouts, underground rainwater tanks, rainwater filtration and treatment systems, systems for pumping rainwater and irrigating green spaces with it, and collection points for drawing on retained rainwater.

The same regulations listed the purchase and installation of an irrigation system, the purchase of tanks and pumping systems, and the construction of an intake for drawing retained rainwater, along with landscaping in the vicinity of the intake, among the eligible costs. Retention ponds, bioretention basins and ditches, and the restoration of small ponds were also funded.

W in this area, the pump is not an additional component, but part of the retention system. An underground tank without a pumping system serves only as storage - the retained water must be brought to the surface to irrigate plantings carried out under the same program. This function is served by irrigation and rainwater pumps, submersible pumps operating in the tank, rainwater systems, and hydrophore sets that stabilize pressure in the irrigation system. This applies to rainwater and retained water, that is, untreated water that is not part of the drinking water system.

Two caveats. First, the cited list comes from the 2025 edition regulations; blue-green infrastructure remained a supported area in the 2026 edition, but the detailed list of costs should be checked in the regulations for the relevant edition. Second, in the 2025 edition, the purchase of fixed assets that beneficiaries could use for other projects was classified as ineligible costs - as were any after-sales services, inspections, repairs, spare parts, and maintenance after project completion. A pump permanently installed as part of an installation is different from portable equipment for a municipal crew, but the final decision on eligibility rests with the province.

Projects that do not involve pumping equipment

Not every project eligible under these programs involves water management. Upgrading outdoor lighting, building lighting points with their own power source, and replacing fixtures - that is, the vast majority of projects on the Mazowsze dla klimatu 2026 Beneficiary List - do not involve hydraulic installations. The section above does not apply to such projects.

A separate case is brine graduation towers, the second most frequently subsidized project type. They operate with brine rather than untreated water, which means different material requirements - above all, resistance to chlorides. The selection of equipment for such an installation should be agreed with its designer or technology supplier; standard water pumps are not designed for this application, and using them in a brine circuit leads to premature corrosion.

Preparation calendar for the next round

The dates below are forecasts based on the recurring pattern of previous rounds, not an official schedule. As of the date this text was published, none of them has been confirmed.

For water companies

  • September–November: Survey and inventory ditch sections, update maps with names, lengths, and the numbers of the end plots, prepare a gross cost estimate, and check that the bylaws, document confirming the board’s appointment, and authorizations are up to date. With a 7-day deadline to remedy formal deficiencies, it is difficult to compile these documents during the application period.
  • December: Monitor the Public Information Bulletin. The call for 2026 was published on December 12, 2025.
  • January: Submit a complete application as early as possible, as grants are awarded in the order applications are received.
  • After signing the agreement: Expenses may be incurred and work may begin only at this stage. Photograph the site before work begins, before equipment is brought onto the section.

For municipalities and counties

  • Autumn: Select a project and prepare a preliminary estimate, along with documents confirming the estimated costs. If a retention system is involved, it is worth determining the technical specifications at this stage, as the cost estimate should not change later.
  • February: Monitor the Voivodeship Executive Board’s resolution register. The regulations for the 2025 and 2026 rounds were adopted on February 24 and February 23, respectively, and the calls for applications were published in the second half of February.
  • March: The application period, usually two or three weeks long. Arrange the certified signature and countersignature of the treasurer in advance.
  • Budget: The municipality must cover 100% of the project costs, since the grant is paid only after the expenses have been settled.

Frequently asked questions

Are Mazovia for Land Drainage and Mazovia for Climate the same program?

No. These are two separate programs run by the Mazowieckie Voivodeship local government and administered by different departments of the Marshal’s Office. Mazovia for Land Drainage is aimed at water companies and is based on a standing resolution of the Regional Assembly adopted under the Water Law. Mazovia for Climate is aimed at municipalities and counties, and its rules are set each year in new regulations adopted by a resolution of the Voivodeship Executive Board.

When will applications open for the next round?

As of July 28, 2026, dates for the next round of any of the programs have not been announced. For Mazovia for Land Drainage, the resolution provides for applications to be accepted from January 2 to 31 of the budget year, and the 2026 call was announced on December 12, 2025. For Mazovia for Climate, applications were accepted in March: from March 3 to 21 in 2025 and from March 2 to 16 in 2026. Check the dates in the Public Information Bulletin of the Marshal’s Office.

How much funding is available under each program?

In W Mazowszu dla melioracji, the grant amounts to 80% of the value of the proposed project, up to a maximum of PLN 100,000. In W Mazowszu dla klimatu, the 2026 edition offered grants of up to 50% of eligible costs, capped at PLN 200,000. Each applicant could submit one application for the full amount or two applications for different projects, within the same total limit.

Can a water company buy a pump with grant money?

The grant primarily covers labor and fuel costs. Purchasing equipment necessary to carry out the project is permitted, but the value of any individual purchase may not exceed PLN 2,000, and the total amount spent on such equipment may not exceed 30% of the grant. The expense must be included in the investor's cost estimate and the list of works in the application, and incurred after the agreement is signed. The Marshal's Office decides whether a specific expense is eligible, so it is worth checking before submitting an application.

Can a municipality fund a rainwater pumping system?

W the 2025 edition rules for the Mazowsze for Climate program, under blue-green infrastructure, systems for pumping and irrigating green spaces with rainwater, gutter-connected and underground tanks, filtration systems, and intake points for collecting retained rainwater are explicitly listed, along with the purchase and installation of an irrigation system among eligible costs. The scope of the next edition should be checked in its own rules, since the list of areas and costs changes between editions.

Can work begin before the agreement is signed?

Not for costs covered by the grant. In W Mazowszu dla melioracji, grant funds may cover only expenses incurred during the project implementation period, which starts on the date the agreement is signed. Preparatory activities may be carried out earlier, but are not eligible for funding: design and cost-estimation documentation, formal and legal approvals, and the procedure for selecting a contractor. The same rule applied to Mazowsze dla klimatu, where eligible costs could be incurred no earlier than the date the agreement was signed.

What determines which grants are awarded when there are more applicants than funding available?

In W Mazowszu dla melioracji, applications are considered in the order they are received. In W Mazowszu dla klimatu, applications undergo a substantive assessment that takes into account, among other things, the G/P indicator, the type of project, and grants previously received under this program. If applications receive the same number of points, their ranking is determined by the date and time the application was submitted.

Is a grant to a water company de minimis aid?

If a water company conducts business activity within the meaning of EU competition law, the grant portion relating to that activity—provided it can be separated from non-economic activity—constitutes de minimis aid granted under the conditions set out in Commission Regulation (EU) 2023/2831. Grants under this scheme may be awarded pursuant to the resolution until December 31, 2030. The application must include certificates of de minimis aid received in the previous 3 years or an appropriate declaration.

Source materials for this document

All cited rules, amounts, and deadlines are based exclusively on official documents and publications by the Mazowieckie Voivodeship local government:

  • Resolution No. 34/22 of the Mazowieckie Voivodeship Regional Assembly of March 22, 2022, on the rules for awarding earmarked grants to water companies,
  • Resolution No. 175/22 of the Mazowieckie Voivodeship Regional Assembly of November 22, 2022 (amending),
  • Resolution No. 124/24 of the Mazowieckie Voivodeship Regional Assembly of November 19, 2024 (amending), together with its explanatory memorandum,
  • Application form and grant agreement template for water companies applicable in 2026,
  • Announcement Mazowsze for Land Drainage 2026 – call for applications (UMWM Public Information Bulletin),
  • Announcement Mazowsze for Climate 2026 – call for applications (UMWM Public Information Bulletin),
  • Regulations for the Mazowieckie Climate Change Adaptation Support Instrument – Mazowsze for Climate 2025 (appendix to Resolution No. 377/61/25 of the Mazowieckie Voivodeship Board),
  • Resolution No. 321/157/26 of the Mazowieckie Voivodeship Board of February 23, 2026, together with the 2026 edition regulations,
  • Resolution No. 70/26 of the Mazowieckie Voivodeship Regional Assembly of May 19, 2026, together with its explanatory memorandum and the List of Beneficiaries of Mazowsze for Climate 2026.

Disclaimer. This text is for informational purposes and describes the situation as of July 28, 2026. The rules for subsequent editions of both programs may differ from those described above, particularly regarding the scope of tasks, funding levels, application deadlines, and the list of eligible costs. Before preparing an application, review the current documents published in the Public Information Bulletin of the Marshal's Office of the Mazowieckie Voivodeship and contact the relevant department: for land drainage matters, the Rural Areas Modernization and Water Management Division in the Department of Agriculture and Rural Development; for the climate program, the Department of Environmental Policy, Geology and Hunting. We do not provide grant advisory services and are not responsible for decisions made on the basis of this document. However, please contact us about selecting a pump for your specific scope of work—please provide the project specifications.

 