{"product_id":"szafa-sterownicza-spp-2x1-1kw-230v-3p","title":"SPP Control Cabinet 2x1.1kW\/230V+3P","description":"\u003csection class=\"edytor_text_component grid_max_1920 grid_center composer_section\" data-mce-fragment=\"1\"\u003e\n\u003cdiv class=\"edytor section_big_wrapper tiny_mce  grid_rwd_1440_element grid_resize\" data-mce-fragment=\"1\"\u003e\n\u003ch3 data-mce-fragment=\"1\"\u003eImplemented functions:\u003c\/h3\u003e\n\u003cul data-mce-fragment=\"1\"\u003e\n\u003cli data-mce-fragment=\"1\"\u003ePower supply two 1~230V pumps with a power of 1.1kW,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eMain switch,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eResidual-current circuit breaker,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eMotor overload protection,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eAuto-0-Hand: Automatic operation, switching off or manual operation of pumps,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eAlternating operation of two pumps,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eIn case of failure of the operating pump, the other one automatically takes over its work,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eIf operating for more than 20 minutes, it switches to the second pump,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003e3 Control levels:\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003eDry run\u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e–\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003eStart\/Stop\u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e–\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003eAlarm\u003c\/span\u003e,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eOptical failure indication:\n\u003cul data-mce-fragment=\"1\"\u003e\n\u003cli data-mce-fragment=\"1\"\u003ePump failure,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003e\n\u003cspan data-mce-fragment=\"1\"\u003e\u003c\/span\u003eAlarm level exceeded in the pumping station.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4 data-mce-fragment=\"1\"\u003eFor cooperation with our SPP control cabinets, we recommend the ZSP-3 level signaling set.\u003c\/h4\u003e\n\u003c\/div\u003e\n\u003c\/section\u003e\n\u003csection class=\"text_and_image_component composer_section grid_center grid_max_1920\" data-mce-fragment=\"1\"\u003e\n\u003cdiv class=\"gallery section_big_wrapper grid_rwd_1440_element grid_resize\" data-mce-fragment=\"1\"\u003e\n\u003cdiv class=\"gallery_inline_grid\" data-mce-fragment=\"1\"\u003e\u003cbr data-mce-fragment=\"1\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/section\u003e\n\u003csection class=\"edytor_text_component grid_max_1920 grid_center composer_section\" data-mce-fragment=\"1\"\u003e\n\u003cdiv class=\"edytor section_big_wrapper tiny_mce  grid_rwd_1440_element grid_resize\" data-mce-fragment=\"1\"\u003e\n\u003ch3 data-mce-fragment=\"1\"\u003eSPP Construction\u003c\/h3\u003e\n\u003cul data-mce-fragment=\"1\"\u003e\n\u003cli data-mce-fragment=\"1\"\u003eNon-flammable plastic enclosure,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eProtection class IP 66,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eWaterproof glands for all cables entering the cabinet,\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eOuter doors lockable with a key.\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eInstallation options: wall mounting, installation on a pedestal attached to the tank plate or buried in the ground (sold separately).\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cspan data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eWARNING!\u003c\/strong\u003e Each of our cabinets contains a description of components and cable connections, facilitating installation and maintenance work.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eAll our switchboards have a CE Declaration of Conformity.\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/section\u003e","brand":"IPRO","offers":[{"title":"Default Title","offer_id":47061836595543,"sku":"003598","price":999999.99,"currency_code":"PLN","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0707\/2943\/3375\/files\/Szafa_Sterownicza_SPP_SPS_SPD.png?v=1749805705","url":"https:\/\/dambat.pl\/en\/products\/spp-control-cabinet-2x1-1kw-230v-3p","provider":"DAMBAT Jastrzębski S.K.A.","version":"1.0","type":"link"}